This site uses cookies to improve your experience. They are safe and secure and never contain sensitive information. For more information click here.
scroll to top

Industrial Flooring - Biscuit Factory

Kelray were appointed to complete various flooring projects throughout the production area in a biscuit factory. We were asked to overlay existing flooring and install a new drainage system in the ingredients mixing room. 

Work involved preparing the existing terrazzo tiles with a diamond grinder and priming tiles with a DPM. We overlay tiles with a 6mm heavy duty polyurethane screed.  We installed a linear surface water drainage system to take standing water away from the machinery.

Due to time and financial restraints the production equipment could not be removed so we had to lay flooring around the fixed machines. All work had to be completed during the Christmas factory shutdown period.