Project Title: Reactive and Planned Maintenance - Audio Parts Manufacturer

Project Date:  2007 - 2013

Project Value: £500,000

Kelray were appointed to complete a number of projects in an audio parts manufacturer in Bridgend.  We began work in the factory in 2007 and maintained a working relationship until the factory closure in 2013.  We carried out a range of projects in the factory including completing various flooring contracts, factory segregation, kitchen refurbishments, replacing fire exit doors, electrical works and many more. 

Industrial Flooring Works

We carried out a range of flooring projects throughout the factory production area

Production Shop Floor

  • Perpared existing foor area using a diamond grinder and dust control units
  • Appiled 1 coat of Pumaprime SF epoxy primer
  • Completed floor with 2mm Pumaflow EF which was hand appiled by trowel

Audio Testing Lab

  • Uplifted existing vinyl tiles
  • Applied 1 coat of Pumaprime SF epoxy primer
  • Completed floor with 2mm Pumaflow EF which was hand applied by trowel

Goods Storage Warehouse

  • Prepared floors with diamond grinder and dust control units
  • Applied 1 coat of Pumatect high build epoxy paint

 Factory Segregation

The project involved segregating part of the factory into smaller rooms

  • Removal of all plant machinery before work could be carried out
  • Erected a steel frame wall with metal stud partitioning to segregate factory
  • Constructed wall out of block work in case of accidental damage etc.
  • Laid new carpet
  • Decoration to steel work
  • Installed new lighting

Kitchen Refurbishment

The project involved replacing an existing kitchen servery with a new kitchen area for staff to prepare their own food

  • Removed existing kitchen servery
  • Fitted new kitchen units
  • Replaced existing ceiling with new suspended ceiling and flourescent lighting
  • Laid vinyl flooring and carpet throughout room
  • Installed new lighting and plumbing works throughout
  • Installed instant hot water bolier