Planned Maintenance - Commercial Office Refurbishment

Project Title:  Planned Maintenance

Project Duration: 6 weeks

Project Value: £160,000

Kelray were appointed to complete refurbishment and renovation to a three storey commericial office building in Merthyr Tydfil town centre.  The work included complete refurbishment to all existing offices and the creation of new offices. We were asked to provide two new fitted kitchens, a number of toilets and a DDA regulated shower area.  The project had to be completed within a 6 week period whilst the office was in working operation. 

Ground Floor Offices & Boardroom

  • All groundfloor wallpaper stripped & re-papered 
  • Full re-decoration throughout
  • New tiled carpets throughout
  • Fitted new oak doors
  • New suspended ceiling tiles and insulation throughout
  • Re-positioned radiators throughout
  • Installed floor sockets in board room
  • Fitted new office furniture throughout
  • New electrics, power & lighting throughout

First Floor Offices

  • Full re-decoration throughout
  • New tiled carpets throughout
  • Fitted new oak doors
  • New suspended ceiling tiles and insulation throughout
  • Fitted new office furniture throughout
  • Fitted new bespoke cabinets
  • New electrics, power & lighting throughout
  • Formed a new office in existing large office space

First Floor Staff Kitchen & Toilet Area

  • Took out existing kitchen and fitted new kitchen
  • Fitted new toilet and sink area
  • Laid vinyl flooring throughout
  • Installed integrated kitchen appliances
  • New electrics, power and lighting throughout
  • Tiled splashbacks in kitchen and toilet area

Reception Area

  • Removed existing glass partitioning and helpdesk area
  • Formed two private bespoke interview rooms which included replacing the existing ceiling with a sound insulated ceiling.
  • Installed new office furniture - including reception desk
  • Installed a new hot water cylinder to provide heating to the entire building
  • Re-decoration throughout
  • New carpet tiles throughout
  • Installed new oak doors
  • New power, electrics and lighting throughout

Groundfloor Kitchen, Toilet & Shower Area

  • Took out existing kitchen area and installed new kitchen inc. vinyl flooring
  • Installed new DDA regulated toilet and sink area
  • Installed a new DDA regulated toilet and shower area, including a new drainage system
  • New decoration and tiling to splashbacks
  • Laid Altro Aquarius vinyl flooring to shower area
  • New electrics, power and lighting throughout